Water damage on Rapid Run
Water damage in basement bathroom area and also throughout the entire basement. The level of water in the area was such that the drywall had to be removed along with the baseboards. The original flooring was rolled linoleum and that also had to be completely removed from all areas. Once that was completed and all areas were checked to make sure they were completely dry we began the process of drywall replacement, and new flooring and baseboards were installed along with completed paint job and rescoring of the toilet. The finished product was completed to the approval of the homeowner who told us it was better than before and that is what we strive to do every time we complete a project.